Log In | Enterprise CRM | Corporate Email
Hydraulic Turbine Governor Electrical Control System Solution
Release date:
2025-08-19
PLC performance requirements are high for governor control applications: the program scan cycle must be as low as 10 ms or less; the I/O closed-loop response time needs to be extremely short. Additionally, the frequency measurement resolution must be exceptionally precise—industry standards mandate a requirement below 0.003 Hz—and the system should feature either PWM output capability or high-precision analog control functionality.
Based on the above speed governor control features, Aote Technology can provide Self-Managed and Controllable NJ300/NJ400 Independent Redundancy Solution and has been successfully applied to Xiangjiaba Unit Speed Control System (8 × 800 MW) 、 Three Gorges Power Plant Unit Speed Control System (12 × 700 MW) 、 Xiluodu Power Plant Unit Speed Control System (18 × 770 MW) 、 Guangzhou Pumped Storage Power Station Plant B Speed Control System (4 × 300 MW) 、 Gezhouba Unit Speed Control System (170 MW & 125 MW) Etc.
Keywords:
The previous one
Service hotline:+8618905163737
Company Headquarters: No. 15, Building B, Zone B, Phase I, Headquarters Economic Park, 69 Fengzhan Road, Yuhuatai District, Nanjing, Jiangsu, P.R. China
Production Center: No. 219 Qinghuiting West Road, Jiangning Economic Development Zone, Nanjing City, Jiangsu Province




