Solution


Atekon Technology Co., Ltd.

Hydraulic Turbine Governor Electrical Control System Solution


Release date:

2025-08-19

PLC performance requirements are high for governor control applications: the program scan cycle must be as low as 10 ms or less; the I/O closed-loop response time needs to be extremely short. Additionally, the frequency measurement resolution must be exceptionally precise—industry standards mandate a requirement below 0.003 Hz—and the system should feature either PWM output capability or high-precision analog control functionality.

Based on the above speed governor control features, Aote Technology can provide Self-Managed and Controllable NJ300/NJ400 Independent Redundancy Solution and has been successfully applied to Xiangjiaba Unit Speed Control System (8 × 800 MW) Three Gorges Power Plant Unit Speed Control System (12 × 700 MW) Xiluodu Power Plant Unit Speed Control System (18 × 770 MW) Guangzhou Pumped Storage Power Station Plant B Speed Control System (4 × 300 MW) Gezhouba Unit Speed Control System (170 MW & 125 MW) Etc.

Keywords:


Related Products